![]() |
|||||
|
|||||
|
Preparations are still in progress, just waiting to deliver a 30-core cable. In the meantime, I canceled the RDM12 lifting chains and rebuilt everything into an 8mm steel cable. Thus, including including the upper part. A 60mm aluminum tube with a wall thickness of 5mm was installed on the rotator. And I attached a winch to pull out the mast. Today, a 10-core power cable arrived on top of the mast technology. Now just plug everything in and we can pull out.
|
||||
OK5AJA |